Effective Manpower Utilization for Optimising Project Scheduling

Lieferzeit: Lieferbar innerhalb 14 Tagen

35,90 

ISBN: 6136672634
ISBN 13: 9786136672632
Autor: Premalatha, S
Verlag: LAP LAMBERT Academic Publishing
Umfang: 52 S.
Erscheinungsdatum: 26.03.2018
Auflage: 1/2018
Format: 0.4 x 22 x 15
Gewicht: 96 g
Produktform: Kartoniert
Einband: Kartoniert
Artikelnummer: 4051827 Kategorie:

Beschreibung

This book contains the tools which can be used to optimise the effective use of resources.When we consider productivity, the problem is how to schedule the resource to obtain expected productivity- which can be solved by this model by planning for high productivity with the available resource at budgeted cost. The model is mainly intended to obtain information from the project, combine with PERT to find the optimum duration of the project.

Autorenporträt

Mrs.S.Premalatha is a Post graduate degree holder in Construction Engg. and Management from Anna University and got her under graduate degree from GCT,Coimbatore. She has served in industries as well as Engineering Institutions in Coimbatore.She has published papers in several journals and conferences. She has attended several workshops, seminars.,

Herstellerkennzeichnung:


BoD - Books on Demand
In de Tarpen 42
22848 Norderstedt
DE

E-Mail: info@bod.de

Das könnte Ihnen auch gefallen …