Time, cost and floor Area relationship

Lieferzeit: Lieferbar innerhalb 14 Tagen

49,00 

for Educational building projects in Ethiopia

ISBN: 3846598569
ISBN 13: 9783846598566
Autor: Tilahun, Muluken
Verlag: LAP LAMBERT Academic Publishing
Umfang: 120 S.
Erscheinungsdatum: 21.06.2012
Auflage: 1/2012
Format: 0.8 x 22 x 15
Gewicht: 197 g
Produktform: Kartoniert
Einband: Kartoniert
Artikelnummer: 3784424 Kategorie:

Beschreibung

Time and cost are the two most important constraints among the four project constraints which are time,cost,quality and safety in project management. In this desertation I have addressed two of the above constraints and it is very interesting issues for project stakeholders in construction and other projects. This desertation has shown the relation ship between time and cost and a model is developed to predict construction time knowing project cost.Further more,this work has shown that there is a direct relationship between Construction cost and building total floor area and a model is develped to predict cost knowing the total floor area of the building from preliminary design. The desertaion can be used as asource document for further study.Similarly the desertation has reviewed different publications which are written in the area.

Autorenporträt

Muluke Tilahun has recived Masters degree in civil engineering in 2010 from Adama University, Ethiopia. He has worked for the past five years in different local organizations.Currently he is working as contract administration head in Metals and Engineering Corporation.

Herstellerkennzeichnung:


BoD - Books on Demand
In de Tarpen 42
22848 Norderstedt
DE

E-Mail: info@bod.de

Das könnte Ihnen auch gefallen …