ROW Risk Management of Road Construction Projects in Urban Areas

Lieferzeit: Lieferbar innerhalb 14 Tagen

61,90 

A Case Study of Addis Ababa, Ethiopia

ISBN: 3659964670
ISBN 13: 9783659964671
Autor: Tegabu, Temesgen
Verlag: LAP LAMBERT Academic Publishing
Umfang: 232 S.
Erscheinungsdatum: 14.11.2018
Auflage: 1/2018
Format: 1.4 x 22 x 15
Gewicht: 364 g
Produktform: Kartoniert
Einband: KT
Artikelnummer: 5951493 Kategorie:

Beschreibung

Almost all Addis Ababa city road projects are exposed to time and cost overrun. Failure of roads also starts before the expected design period expires. The objective of this research is to identify the factors adversely affecting the objectives of AACRA road projects and to propose recommendation on how to deal with the problems. To achieve the objectives of the research, case study of 10 road projects selected from Addis Ababa, desk studies relevant to the subject matter and 10 interview responses from professionals from the client, consultants and contractors that have been currently working with AACRA have been rigorously assessed. The findings from the research show that the major problem for non-achieving project objectives of AACRA roads is the slow clearance of obstructions from ROW construction limit. There is no formal risk management entertained by any of the parties to address the issue. This book also introduces a Project Definition Rating Index (PDRI) tool which is believed by the researcher helpful to assess scope definition completeness at various stages of AACRA road preproject planning process.

Autorenporträt

Temesgen Tegabu, BSc, M.Sc: Studied Civil Engineering at Addis Ababa University, Ethiopia. Presently Claim Expert at DOHWA-IPE-MCE JV Consulting Engr. for Industrial Park Construction Projects in A.A. Also Fdr & GM at FORTRESS Eng. Consultants Plc.

Das könnte Ihnen auch gefallen …