Time Estimation for Improvement in Construction Industry

Lieferzeit: Lieferbar innerhalb 14 Tagen

55,90 €

Using Deming Theory

ISBN: 3659940372
ISBN 13: 9783659940378
Autor: Ghafourian, Kambiz/Kabirifar, Kamyar/Mohamed, Zainai
Verlag: LAP LAMBERT Academic Publishing
Umfang: 140 S.
Erscheinungsdatum: 27.09.2016
Auflage: 1/2016
Format: 0.9 x 22 x 15
Gewicht: 227 g
Produktform: Kartoniert
Einband: Kartoniert
Artikelnummer: 9928851 Kategorie:

Beschreibung

Currently, the construction sector worldwide is facing a dilemma similar to that confronted by manufacturers in the past decades. It is regarding to the complexity and fragmentation of construction supply chain, products and processes because construction is being one-of-a-kind production. Productivity in the construction industry is largely unmeasured explicitly inside the process, and if measured they are contradictory and conflicting. The aim of this study is to use time as the main source of waste measurement in construction projects. It is measured through different structural construction activities according to the specific volume of the works done. The use of statistics and figures extracted from a case study are to be supplemented with the application of DEMING theory of plan, do, check and act. DEMING theory emphasizes on the daily monitoring and measuring the project and benefitting from re-planning for the better improvement of the project in the necessary occasions.

Autorenporträt

Kambiz Ghafourian is a Ph.D. candidate & research assistance at UTM Razak school of Engineering and Advanced Technology, Universiti Teknologi Malaysia. Kamyar Kabirifar received his M.Sc in Construction Management from UTM. Zainai Bin Mohamed is a professor emeritus at UTM Razak Schoool.

Herstellerkennzeichnung:


OmniScriptum SRL
Str. Armeneasca 28/1, office 1
2012 Chisinau
MD

E-Mail: info@omniscriptum.com

Das könnte Ihnen auch gefallen …