Communication Protocols, Queuing and Scheduling Delay Analysis

Lieferzeit: Lieferbar innerhalb 14 Tagen

71,90 

in CANDU SCWR Hydrogen Co-generation Model

ISBN: 3659824208
ISBN 13: 9783659824203
Autor: Ahmed, Fayyaz
Verlag: LAP LAMBERT Academic Publishing
Umfang: 168 S.
Erscheinungsdatum: 08.12.2018
Auflage: 1/2018
Format: 1.1 x 22 x 15
Gewicht: 268 g
Produktform: Kartoniert
Einband: Kartoniert
Artikelnummer: 6084565 Kategorie:

Beschreibung

Industrial dynamical, Networked Control Systems (NCSs) are controlled over a communication network. We study a continuous-time CANada Deuterium Uranium-Super Critical Water Reactor (CANDU-SCWR) hydrogen plant and a discrete-time controller, sensor and actuator block, that are connected via a communication network, such as e.g. controller area network (CAN), Ethernet or wireless networks. Issues associated with NCSs are time-varying delays, timevarying sampling intervals and loss of data due to packet drop outs. Delays are also associated with software chosen, control system architecture and computation load. CANDU-SCWR hydrogen co-generation model reliability can be analyzed by dynamic flow graph methodology. We have analyzed the CANDU-SCWR feed water integration with the oxygen unit of copper chloride cycle and also conducted an analytical review of the current networked control system delays.

Autorenporträt

Fayyaz Ahmed - Degree of Master of Applied Science in the Faculty of Engineering and Applied Science, Electrical and Computer Engineering, University of Ontario Institute of Technology.

Herstellerkennzeichnung:


OmniScriptum SRL
Str. Armeneasca 28/1, office 1
2012 Chisinau
MD

E-Mail: info@omniscriptum.com

Das könnte Ihnen auch gefallen …