ROV 86: Remotely Operated Vehicles

Lieferzeit: Lieferbar innerhalb 14 Tagen

213,99 

Technology RequirementsPresent and Future Proceedings of the ROV 86 Conference organized by the Marine Technology Society, the Society for Underwater Technology and the Association of Offshore Diving Contractors and held in Aberdeen, UK, 2426 June 1986

ISBN: 0860108155
ISBN 13: 9780860108153
Autor: Wernli, Robert L/Chapman, Roger
Verlag: Springer Verlag GmbH
Umfang: viii, 366 S., 22 s/w Illustr., 366 p. 22 illus.
Erscheinungsdatum: 30.06.1986
Produktform: Gebunden/Hardback
Einband: GEB

Proceedings of the ROV ’86 Conference organised by the Marine Technology Society, the Society for Underwater Technology and the Association of Offshore Diving Contractors, and held in Aberdeen, UK, June 24-26, 1986

Artikelnummer: 1421081 Kategorie:

Beschreibung

There is now an awareness within the industry, particularly as oil companies direct considerable resources towards developing diverless production systems, that a fully integrated approach to equipment design and intervention is necessary to achieve an acceptable system. The requirement for an integrated approach to equipment design and intervention is applicable not only to diverless depths but to all subsea structures, equipment and intervention techniques in whatever depth. Fortunately the inherent dexterity of the diver does not impact so severely on design as other intervention techniques. However the benefits of an integrated approach are still applicable and the use of such simple "diver aids" as cutting guides and subsea markings installed prior to the installation of jackets and subsea equipment can have a significant impact on the cost of intervention. This paper examines the requirements and limitations in designing subsea equipment for Remotely Operated Vehicle (ROV) intervention. For the oil company embarking on the development of a diverless production system, be it totally diverless because of the envisaged water depth or primarily diverless with the possibility of diver back up, the intervention techniques adopted will strongly influence the final system design. The necessity to undertake an extensive development programme to produce the optimum intervention system is very costly, requires long lead times and comprehensive testing particularly where novel solutions are adopted. It is a daunting prospect for even the most progressive of oil companies.

Das könnte Ihnen auch gefallen …